Saturday 7 August 2010

Project Planner with PCSB

We have vacancy for the following details:

As attached

Other requirements need to be provided together with proposed personnel resume:

1. Letter of Consents - As attached
2. Copy of Competency Certificates/Training Certificates/References
3. Photograph
4. Mob and demob cost - Mob & Demob cost shall be inclusive of airfare, lodging, transportation, meals, other travel expenses, administration expenses and other costs associated with Mobilisation and Demobilisation between the Point of origin and Point of Assignment.

Please response on this matter ASAP since the closing date on 10/8/2010.
Should you need further clarifications please do not hesitate to contact us.

Best regards,

Norlida Jamaludin
ALFA-MELI OILFIELD SERVICES SDN BHD
Unit C-8-3, 8th Floor, Block C
Megan Avenue II
No. 12, Jalan Yap Kwan Seng
50450 Kuala Lumpur
MALAYSIA
Tel: 603-2164 4889 Fax: 603-2161 2889
lida@alfameli.com

No comments:

© 2008

Tujuan kami mewujudkan blog ini ialah untuk mengumpulkan seberapa ramai sahabat-sabahat yang telibat di dalam bidang minyak dan gas ini, terutamanya kepada yang terlibat didalam bidang NDT dan juga Inspector.

Berita-berita di dalam blog ini adalah dipetik dari beberapa laman web lain, namum begitu, jika anda mempunyai sebarang berita, cerita, jawatan kosong, sila hantarkan artikel anda kepada blogmaster di alamat duniandt@yahoo.com.my

Sebarang artikel atau komen yang berbentuk hasutan, benci-membenci, boleh memecah belahkan perpaduan atau yang tidak berkait langsung dengan tajuk, akan dipadam.